top of page

About

Express Architectural Design and Newhall Property Services are a small company, so we can keep costs low. You can be ensured that you are a client known by name and project, not by a job number. It is essential to us that when someone is working with your home,factory,or farm your dreams and your finances, you want to be assured that you will be number one.

 

We offer a simple and cost effective fixed price architectural services with all amendments to drawings included in the price. Most people will know what they want to achieve and we offer the advice, experience and expertise needed to create a beautiful new home,office,or block of apartments.

 

If you need extension plans or you want to build a new home we offer the expertise to undertake the design and planning process on your behalf. Our service will take you step by step from an initial feasibility study through to detailed construction drawings

John Lancashire

1)Feasibility: We will visit your home for consultation. This element will cost you nothing and ends with us providing you with a detailed fixed price quotation for all design elements.

 

2)Site Survey: On average takes 4 to 6 hours on site to measure existing property.

 

3)Proposed Drawings: This will be the first draft of your proposed extension or new build house. These drawings will allow you to review and make changes before we submit them for planning approval.

 

4)Submit the Application: When you finalised the design other details are added required by the planners. We will then complete all necessary application forms, design/access statements and submit the application on your behalf.

Andrew Chrobok

Application

1)Building regs drawings: Details are added to the planning drawings specifying details for all 14 parts of the building regulations such as: Structure, Fire safety, Site Preparation, Drainage Etc.

 

2)Submit the Application: After we completed the drawings and consulted structural engineers if required, we will then complete all necessary application forms and submit the application on your behalf.

 

3)After the Application: Building regulation can take up to four weeks with any feedback from building control incorporated into the drawings by us. Once building control has approved the drawings you will have a detailed set of working drawings that can be given to your chosen builder.

bottom of page